Risk assessment on Hämeenkyrö municipal solid waste incinerator

From Opasnet
Revision as of 21:17, 31 May 2007 by Jouni (talk | contribs) (→‎Objective: imagemap added)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Risk assessment on Hämeenkyrö municipal solid waste incinerator contains a structured risk assessment of a plan to build a MSWI in Hämeenkyrö. There was a public vote related to a city planning decision: whether the municipality should plan an area for the plant or not. The vote was held in November 19, 2006.

This risk assessment consists of several pages, and the links to all of these pages can be found from a category page Category:Risk assessment on Hämeenkyrö municipal solid waste incinerator.


Objective

Health risk assessment related to the effects of the planned MSWI plant in Hämeenkyrö. Health of the population in Hämeenkyrö especially, and in Southern Finland in general. The scope contains a) the background risk due to the key emissions and b) the incremental risk due to the building and operation of the MSWI. Time scope: next 20 years (draft)

Well-beingEconomyClimatic effects of Hämeenkyrö MSWIOptions with the Hämeenkyrö MSWI