Talk:MSWI plants and plans in southern Finland: Difference between revisions
Jump to navigation
Jump to search
(Parameters corrected) |
|||
Line 2: | Line 2: | ||
{{Discussion | {{Discussion | ||
| | |Statements = MSW incineration is constrained by EU-directive | ||
| | |Resolution = Accepted. | ||
|Argumentation = | |Argumentation = | ||
{{Defend|1|The MSWI in Hämeenkyrö should comply with the Incineration Directive (2000/76/EC)|Eva}} | {{Defend|1|The MSWI in Hämeenkyrö should comply with the Incineration Directive (2000/76/EC)|Eva}} | ||
Line 14: | Line 14: | ||
{{Discussion | {{Discussion | ||
| | |Statements = Finnish MSWI are co-incineration plants and subjected to emission limit values in Annex 2 Incineration Directive (2000/76/EC). | ||
| | |Resolution = Resolution not reached. [[Category:Open discussions]] | ||
|Argumentation = {{Defend|5|Definition of Co-incineration plants: Facilities whose main purpose is to produce energy or material products and which use waste as a regular or additional fuel, this waste being thermally treated for the purpose of disposal|Eva}} | |Argumentation = {{Defend|5|Definition of Co-incineration plants: Facilities whose main purpose is to produce energy or material products and which use waste as a regular or additional fuel, this waste being thermally treated for the purpose of disposal|Eva}} | ||
:{{Attack|6|As far as I can tell at this moment the only MSWI is in Turku, but future plans are mainly for waste incineration, not for co-incineration. So Annex 1 is valid for the most part.|[[User:Marjaleena|Marjaleena]] 11:29, 28 September 2006 (EEST)[[User:193.167.195.60|193.167.195.60]] 11:25, 28 September 2006 (EEST)}} | :{{Attack|6|As far as I can tell at this moment the only MSWI is in Turku, but future plans are mainly for waste incineration, not for co-incineration. So Annex 1 is valid for the most part.|[[User:Marjaleena|Marjaleena]] 11:29, 28 September 2006 (EEST)[[User:193.167.195.60|193.167.195.60]] 11:25, 28 September 2006 (EEST)}} | ||
Line 24: | Line 24: | ||
{{Discussion | {{Discussion | ||
| | |Statements = Selection of waste management options is subject to EU Waste Framework Directive. | ||
| | |Resolution = Accepted. | ||
|Argumentation = {{Defend|8|The EU has a framework for coordination waste management within the Community in order to limit the generation of waste (orginal Directive: 75/442/EC): "Member states must prohibit the abandonment, dumping or uncontrolled disposal of waste. They shall promote waste prevention, recycling and processing for reuse." ..."establishing an integrated and adequate network of disposal installations (taking account of the best available technologies)." → Insert arrow from 'Waste management options' to 'Constrained by EU-directive' in model.|Eva}} | |Argumentation = {{Defend|8|The EU has a framework for coordination waste management within the Community in order to limit the generation of waste (orginal Directive: 75/442/EC): "Member states must prohibit the abandonment, dumping or uncontrolled disposal of waste. They shall promote waste prevention, recycling and processing for reuse." ..."establishing an integrated and adequate network of disposal installations (taking account of the best available technologies)." → Insert arrow from 'Waste management options' to 'Constrained by EU-directive' in model.|Eva}} | ||
}} | }} |
Latest revision as of 08:32, 16 November 2009
MSWI constrained by EU-directive
Fact discussion: . |
---|
Opening statement: MSW incineration is constrained by EU-directive
Closing statement: Accepted. (A closing statement, when resolved, should be updated to the main page.) |
Argumentation:
←--1: . The MSWI in Hämeenkyrö should comply with the Incineration Directive (2000/76/EC) Eva (type: truth; paradigms: science: defence)
|
Incineration or co-incineration?
Fact discussion: . |
---|
Opening statement: Finnish MSWI are co-incineration plants and subjected to emission limit values in Annex 2 Incineration Directive (2000/76/EC).
Closing statement: Resolution not reached. (A closing statement, when resolved, should be updated to the main page.) |
Argumentation:
←--5: . Definition of Co-incineration plants: Facilities whose main purpose is to produce energy or material products and which use waste as a regular or additional fuel, this waste being thermally treated for the purpose of disposal Eva (type: truth; paradigms: science: defence)
|
Waste management options
Fact discussion: . |
---|
Opening statement: Selection of waste management options is subject to EU Waste Framework Directive.
Closing statement: Accepted. (A closing statement, when resolved, should be updated to the main page.) |
Argumentation:
←--8: . The EU has a framework for coordination waste management within the Community in order to limit the generation of waste (orginal Directive: 75/442/EC): "Member states must prohibit the abandonment, dumping or uncontrolled disposal of waste. They shall promote waste prevention, recycling and processing for reuse." ..."establishing an integrated and adequate network of disposal installations (taking account of the best available technologies)." → Insert arrow from 'Waste management options' to 'Constrained by EU-directive' in model. Eva (type: truth; paradigms: science: defence)
|