List of open tasks: Difference between revisions

From Opasnet
Jump to navigation Jump to search
(Intarese toolbox tasks added)
(→‎Writing of Intarese Toolbox pages (WP1.4): page locations in toolbox were added)
Line 11: Line 11:
! Planned deadline  deliverable
! Planned deadline  deliverable
! Delivered as general product (yes/ no/ partly)
! Delivered as general product (yes/ no/ partly)
! Need, nice or not to have in the toolbox
! Location in toolbox<sup>2</sup>
! Delivered into the toolbox (yes/ no/ partly)
! Delivered into the toolbox (yes/ no/ partly)
! Type of page<sup>1</sup>
! Type of page<sup>1</sup>
Line 17: Line 17:
! Comments
! Comments
|----
|----
| Indicator selection
| Indicator selection|| 54|| yes|| What indicators should be used.../ building good indicators|| no|| G|| PBL Eva||  
| 54
| yes
| need
| no
| G
| PBL Eva
|  
|----
|----
| Calculating DALYs
| Calculating DALYs and QALYs|| 54|| yes|| Execution/ impact analysis/ measures of impact || partly|| G|| RIVM Anne||  
| 54
| yes
| need
| partly
| G
| RIVM Anne
|  
|----
|----
| Calculating DALYs
| Calculating DALYs and QALYs|| 54|| no|| Execution/ impact analysis/ measures of impact || [http://www.integrated-assessment.eu/resource_centre/impact_calculation_tool partly]|| M|| RIVM Anne?||  
| 54
| no
| need
| [http://www.integrated-assessment.eu/resource_centre/impact_calculation_tool partly]
| M
| RIVM Anne?
|  
|----
|----
| [[DALY weights|Calculating DALYs]]
| [[DALY weights|Severity weights]]|| 54|| no|| Execution/ impact analysis/ measures of impact/Calculating DALYs and QALYs || || D|| RIVM Anne|| SAME AS D128. SOME MATERIAL from the link
| 54
| no
| need
|  
| D
| RIVM Anne
| SAME AS D128. SOME MATERIAL from the link
|----
|----
| Methods for monetization
| Monetisation methods|| 54|| yes?|| Execution/ impact analysis/ measures of impact || partly?|| G + M + D|| USTUTT Alex||  
| 54
| yes?
| need
| partly?
| G + M + D
| USTUTT Alex
|  
|----
|----
| Risk Perception
| Risk Perception|| 54|| yes?|| What indicators should be used... || no|| G + M?|| RIVM Ric?||  
| 54
| yes?
| need
| no
| G + M?
| RIVM Ric?
|  
|----
|----
| [[Open assessment]]
| [[Open assessment]]|| 54|| ready|| Issue framing/ key points/ concept of IEHIA/ other assessment methodologies|| no|| G|| THL Jouni||  
| 54
| ready
| nice
| no
| G
| THL Jouni
|  
|----
|----
| [[Opasnet Base|Result database]]
| [[Collaborative workspace]] || -|| ready|| Execution/ Key considerations/ collaborating on an assessment || no|| D || THL Jouni||
| 54
| no
| need
| no
| D
| THL Jouni
|  
|----
|----
| Multiple bias [http://heande.opasnet.org/wiki/Combining_dioxin_epidemiology_and_toxicology]
| [[Opasnet Base|Result database]]|| 54|| no|| Design/ feasibility testing/ information needs || no|| D|| THL Jouni||  
| 54
| no
| need
| no
| G
| THL Marjo
|  
|----
|----
| [[Value of information]]
| Multiple bias [http://heande.opasnet.org/wiki/Combining_dioxin_epidemiology_and_toxicology]|| 54|| no|| Design/ feasibility testing/ information needs/ exposure-response functions || no|| G|| THL Marjo||  
| 54
| yes
| need
| [http://www.integrated-assessment.eu/node/221 yes]
| G
| THL Jouni
|  
|----
|----
| [[:File:VOI_analysis.ANA|Value of information model]]
| [[Value of information]]|| 54|| yes|| Execution/ uncertainty analysis|| [http://www.integrated-assessment.eu/node/221 yes]|| G|| THL Jouni||  
| 54
| yes
| need
| no
| M
| THL Jouni
|  
|----
|----
| Quality/Performance [http://heande.opasnet.org/wiki/Purpose_and_properties_of_good_assessments]
| [[:File:VOI_analysis.ANA|Value of information model]]|| 54|| yes|| Execution/ uncertainty analysis/ value of information|| no|| M|| THL Jouni||  
| 54
| yes
| need
| no
| G
| THL Mikko
|  
|----
|----
| [[:heande:Protocol on stakeholder involvement|Protocol on stakeholder involvement]]. [http://heande.opasnet.org/wiki/Organizing_stakeholder_involvement]
| Quality/Performance [http://heande.opasnet.org/wiki/Purpose_and_properties_of_good_assessments]|| 54|| yes|| Execution/ uncertainty analysis|| no|| G|| THL Mikko||
| 50
| yes
| need
| no
| G
| THL Mikko
| Part of D47 (detailed description). Delivered at mo 50.
|----
|----
| [[Participating in assessments]] [http://heande.opasnet.org/wiki/HI:D47_Protocol_on_stakeholder_involvement]  
| [[:heande:Protocol on stakeholder involvement|Protocol on stakeholder involvement]]. [http://heande.opasnet.org/wiki/Organizing_stakeholder_involvement]|| 50|| yes|| Issue framing/ Who are the stakeholders/ Engaging stakeholders/ methods for stakeholder engagement|| no|| G|| THL Mikko|| Part of D47 (detailed description). Delivered at mo 50.
| 50
|----
| yes
| [[Participating in assessments]] [http://heande.opasnet.org/wiki/HI:D47_Protocol_on_stakeholder_involvement] || 50|| yes|| Issue framing/ Who are the stakeholders/ Engaging stakeholders/ methods for stakeholder engagement|| no|| G|| THL Mikko|| Part of D47 (an overview).
| need
| no
| G
| THL Mikko
| Part of D47 (an overview).
|----
|----
|}
|}


<sup>1</sup> Types of toolbox pages: (Guidebook/ Resource - Model or tool/ Resource - Worked Example/ Resource - Data)
<sup>1</sup> Types of toolbox pages: (Guidebook/ Resource - Model or tool/ Resource - Worked Example/ Resource - Data)<br>
<sup>2</sup> Based on the toolbox structure on 6 May 2010 [http://N:\YMTO\PROJECTS\INTARESE\WP4_2\Toolbox_structure_v4.ppt]


==Templates of page types==
==Templates of page types==

Revision as of 14:24, 17 May 2010


Information collection

Writing of Intarese Toolbox pages (WP1.4)

Specification of deliverables (according to deliverables list Feb 2010) Planned deadline deliverable Delivered as general product (yes/ no/ partly) Location in toolbox2 Delivered into the toolbox (yes/ no/ partly) Type of page1 Person responsible for remaining tasks Comments
Indicator selection 54 yes What indicators should be used.../ building good indicators no G PBL Eva
Calculating DALYs and QALYs 54 yes Execution/ impact analysis/ measures of impact partly G RIVM Anne
Calculating DALYs and QALYs 54 no Execution/ impact analysis/ measures of impact partly M RIVM Anne?
Severity weights 54 no Execution/ impact analysis/ measures of impact/Calculating DALYs and QALYs D RIVM Anne SAME AS D128. SOME MATERIAL from the link
Monetisation methods 54 yes? Execution/ impact analysis/ measures of impact partly? G + M + D USTUTT Alex
Risk Perception 54 yes? What indicators should be used... no G + M? RIVM Ric?
Open assessment 54 ready Issue framing/ key points/ concept of IEHIA/ other assessment methodologies no G THL Jouni
Collaborative workspace - ready Execution/ Key considerations/ collaborating on an assessment no D THL Jouni
Result database 54 no Design/ feasibility testing/ information needs no D THL Jouni
Multiple bias [1] 54 no Design/ feasibility testing/ information needs/ exposure-response functions no G THL Marjo
Value of information 54 yes Execution/ uncertainty analysis yes G THL Jouni
Value of information model 54 yes Execution/ uncertainty analysis/ value of information no M THL Jouni
Quality/Performance [2] 54 yes Execution/ uncertainty analysis no G THL Mikko
Protocol on stakeholder involvement. [3] 50 yes Issue framing/ Who are the stakeholders/ Engaging stakeholders/ methods for stakeholder engagement no G THL Mikko Part of D47 (detailed description). Delivered at mo 50.
Participating in assessments [4] 50 yes Issue framing/ Who are the stakeholders/ Engaging stakeholders/ methods for stakeholder engagement no G THL Mikko Part of D47 (an overview).

1 Types of toolbox pages: (Guidebook/ Resource - Model or tool/ Resource - Worked Example/ Resource - Data)
2 Based on the toolbox structure on 6 May 2010 [5]

Templates of page types

The following template pages should be updated based on the following object structure descriptions. The Template:Assessment structure has been done as example.

Rewriting existing topics in Opasnet

Some pages are outdated or overlapping with other pages. Therefore, there are needs to restructure and rewrite existing pages.


Page type update

All pages should have a page type. Also, some pages have been classified into a poor page type, because the practices have changed over time. Also the structure should be improved towards Scope, Definition, Result if applicable. Therefore, there are tasks to:

  • develop a page that lists all pages without a page type,
  • go through all pages without a page type and classify them,
  • reclassifying pages into better types when they are being edited for other reasons.
  • The current pages will be cleaned up. Two major things: check the page type (variable, assessment...), and add any relevant categories.
  • The Variable namespace should be checked, as a lot of it seems to have moved to the Main namespace. The original tasks were divided as follows:
    • Variable namespace A-D Päivi
    • E-F Mikko
    • G-O Erkki DONE
    • P-W Pasi
    • Main namespace A-B Virpi
    • C Pauliina

Improving categorisation

The existing categories are not well developed and systematic. Therefore, there are tasks to:

  • improve the categorisation system, preferably based on some existing classification,
  • go through the pages and update categories.
  • Category:Assessment method articles categorized to Category:Method instead.

Writing about important topics

There are several important topics that should be covered in Opasnet. However, these are not simple copy-paste work and they require that someone gets acquainted with the topics and summarises them. Such topics are listed here:

  • Artikkeli bisneksestä, jossa valtio maksaa siitä, että joku auttaa toista säästämään energiaa. Ennen säästötoimia kirjataan energiankulutus, ja säästöä seurataan. Konsultti saa palkkionsa toteutuneen säästön mukaan. Jos tulee lisäkulua, konsultti joutuu maksumieheksi. Onko tästä jo artikkeli jossain? Tyjakissa?


Checking potentially important web links

Some web links seem interesting and important for Opasnet, but more time is needed to look at those. Only then it is possible to decide, whether the information should be linked to from some Opasnet pages, or whether the information deserves a page of its own. These web links include:

Upload the results of the models into the Opasnet Base

Copying dissertation theses of THL/YMTO to Opasnet

  • All theses produced in THL/YMTO should be chopped into pieces and encyclopedia articles should be made out of them in Opasnet.