Options with the Hämeenkyrö municipal solid waste incinerator: Difference between revisions
(→Definition: upstream links added) |
mNo edit summary |
||
(3 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
{{variable}} | |||
[[Category:Policy options]] | [[Category:Policy options]] | ||
[[Category:Risk assessment on Hämeenkyrö municipal solid waste incinerator]] | [[Category:Risk assessment on Hämeenkyrö municipal solid waste incinerator]] | ||
[[Category:Calculations with Analytica code]] | [[Category:Calculations with Analytica code]] | ||
'''Scope'''<br> | |||
'''Options with the Hämeenkyrö municipal solid waste incinerator''' (MSWI) describes the possible decisions and options related to the possible MSWI in the municipality of Hämeenkyrö, Finland. | |||
==Description== | ==Description== | ||
The texts have been copied from [[: | The texts have been copied from [[:op_fi:Hämeenkyrön jätteenpolttolaitos|the respective Finnish site]], and they will be translated into English. | ||
===Background=== | ===Background=== |
Latest revision as of 11:06, 17 June 2009
Moderator:Nobody (see all) Click here to sign up. |
|
Upload data
|
Scope
Options with the Hämeenkyrö municipal solid waste incinerator (MSWI) describes the possible decisions and options related to the possible MSWI in the municipality of Hämeenkyrö, Finland.
Description
The texts have been copied from the respective Finnish site, and they will be translated into English.
Background
Finnish energy company Vapo is planning a municipality solid waste incinerator (MSWI) in Hämeenkyrö. The purpose is to produce electricity, heat and steam for the community and the nearby cardboard mill. The waste would come from Pirkanmaa area. The planned thermal power would be 80 MW, and it would use 200 000 tons of solid waste and sludge per year. [1]
The plant would locate near the municipality centre, and also near a source of groundwater. The ash produced would be transported to a hazardous waste landfill in an other municipality (either Forssa or Riihimäki) There is an active citizen group against the plan. [2]
Currently there is a gas combi plant near the cardboard mill, and it provides a major part of the energy to the mill. [3] [4] Thus, in addition to the incinerator, there are issues related to the existing gas plants, and land owning. [5] [6]
Location
The planned location of the plant is the field near the community centre in the middle of the map. [7]
Public vote
There was a public vote about whether or not to make a city plan change to allow the siting of the plant. The vote was held on 19 November, 2006. [8] [9] The result of the vote was the following.
Voting options | number of votes |
---|---|
Yes | 2029 |
No | 2159 |
I don't support either of the previous choices | 190 |
Before the vote, there was a public hearing about the case. There was a presentation about the health impacts of the plan by academy researcher Jouni Tuomisto. [10]
Stakeholders
- Hämeenkyrö municipality council [11]
- Energy company Vapo (Suomen valtio & Metsäliitto Osuuskunta) [12] [13] [14]
- Cardboard mill owner M-Real (Metsäliitto Osuuskunta) [15] [16]
- Finnforest (Metsäliitto Osuuskunta) [17] [18]
- Kyro Power Oy (owns the gas plant) (Kyro Oyj Abp) [19] [20]
- Citizen activity group Hämeenkyrön puolesta - hyvässä hengessä kansalaisliike [21]
Definition
Causality
- Variable:Municipal solid waste production in Häme
- Variable:MSWI plants and plans in southern Finland
Data
Possible options for each decision-maker are the following.
Citizen: Different options in the public vote on 19 Nov 2006: Should the municipality allow for such a change in the city plan that it would be possible to site a MSWI?
- Yes
- No
- Neither of the previous options
Municipality council will decide about the change in the city plan so that it would be possible to site a MSWI. Possible options:
- Yes
- No
The company planning to build the MSWI, if the city plan change is favourable, has options after evaluating the economic and other impacts of the planned MSWI:
- Build the MSWI plant
- Do not build the MSWI plant
Formula
<anacode>
['The municipality council NO',
'The municipality council YES, the company NO',
'The municipality council YES, the company YES']
</anacode>
Unit
-
Result
Combined options
- The municipality council NO
- The municipality council YES, the company NO
- The municipality council YES, the company YES