Health impacts of fine particles in Rauma

From Opasnet
Jump to: navigation, search



Question

How large are the emissions and health impacts of fine particles in Rauma, Finland? The focus is on emissions from the port of Rauma.

Answer

A recent model run

Premature deaths per year
Urban planning option Result
Option 1 (Centre and nearby areas 2.83
Option 2 (From centre to sea) 2.28
Option 3 (Shores and paths) 2.79

More precise descriptions of the urban planning options that are currently under evaluation can be found from an Opasnet page (in Finnish only). This model also exists in Finnish. Discussions related to the assessment and its results are here (but only in Finnish).

Rationale

⇤--#:: . The distribution model used has a resolution of 1 km only. This is not precise enough. The model only gives rough estimates and probably underestimates impacts. --Jouni Tuomisto 25. October 2012 00.24 (EEST) (type: truth; paradigms: science: attack)

⇤--#:: . It is true that the model underestimates exposure from sources closer than a few hundred metres. However, the direction of the bias is known, and in this case it undersestimates the results of especially Option 1 and 3, which contain more traffic in the city centre. Even with the current precision, the impacts seem higher than in option 2. So, the model fulfils its purpose to answer the question about whether there are differences in health impacts between the three options. There seem to be. --Jouni Tuomisto 25. October 2012 11.26 (EEST) (type: truth; paradigms: science: attack)

Calculations

NOTE! Currently the model calculates fine particle concentrations and exposures only within 10-15 km from the source.

Key for the default model run: [1] BJ9p0oAwwPRGJ2sg (1000 iterations, 4 min 20 s)

Number of iterations:

Show intermediate results?:

+ Show code

----#: . Code seems to work, but gives the yellow errorbox --Heta 12:49, 27 August 2013 (EEST) (type: truth; paradigms: science: comment)

Ovariables (open assessment variables) used in the model:

  • Health impacts (Terveysvaikutukset): inputs: Altistuminen * erf * bg.mort
    • Exposure-response function for PM (erf): constant, is given in the code
    • Background mortality (bg.mort): constant, given in the code
    • Exposure (Altistuminen): inputs: Pitoisuus, LO, LA
      • Uses function GIS.Exposure(Pitoisuus, LO, LA, ...)
      • Longitude (LO) and latitude (LA): given within the ovariable concentration (Pitoisuus).
      • Concentration (Pitoisuus): inputs: Päästö, LO, LA.
        • LO and LA: given within the ovariable emission (Päästö).
        • Uses function GIS.Concentration.matrix(Päästö, LO, LA, ...)
        • Emission (Päästö): inputs Traffic volume (Tieliikennepäästöt) (at this point, only unit conversions).

Data

Health impacts of fine particles in Rauma(-)
ObsCity planning optionVehicleModeLALOUnitTraffic volumeLengthDescription
1Option 1TruckRoad transport with 70 % load61.13163421.491318kpl-km /d26629.5Emission location is asssumed near the centre of Rauma
2Option 1Electric train61.13163421.491318ton-km /d69539.5Emission location is asssumed near the centre of Rauma
3Option 1Diesel train61.13163421.491318ton-km /d69539.5Emission location is asssumed near the centre of Rauma
4Option 2TruckRoad transport with 70 % load61.13163421.491318kpl-km /d12469.5Emission location is asssumed near the centre of Rauma
5Option 2TruckRoad transport with 70 % load61.10669821.492348kpl-km /d165310.1Emission location is assumed at highway 8.
6Option 2Electric train61.09780221.492691ton-km /d277514.9Emission location is assumed at the southern railroad.
7Option 2Diesel train61.09780221.492691ton-km /d277514.9Emission location is assumed at the southern railroad.
8Option 2Electric train61.13163421.491318ton-km /d32549.5Emission location is asssumed near the centre of Rauma
9Option 2Diesel train61.13163421.491318ton-km /d32549.5Emission location is asssumed near the centre of Rauma
10Option 3TruckRoad transport with 70 % load61.13163421.491318kpl-km /d26629.5Emission location is asssumed near the centre of Rauma
11Option 3Electric train61.13163421.491318ton-km /d69539.5Emission location is asssumed near the centre of Rauma
12Option 3Diesel train61.13163421.491318ton-km /d69539.5Emission location is asssumed near the centre of Rauma
13Option 1Ship61.12709521.407547ton /a5.7Ship emissions, location is assumed at Ruuhiluoto
14Option 2Ship61.12168821.444626ton /a5.7Ship emissions, location is assumed at Järviluoto
15Option 3Ship61.12709521.407547ton /a5.7Ship emissions, location is assumed at Ruuhiluoto


  • Table contains the traffic that changes between the three city planning options in the port, city centre, or highway. The traffic volumes are assumed to correspond the port expansion plan Ve2 (Ruuhiluoto) in options 1 and 3; and port expansion plan Ve3 (Järviluoto) in option 2.
  • The lengths of routes and assumed emission points (that are chosen to reflect the typical emission distance from the population) are shown on the Google map below. Single points are used because the dispersion model does not take line sources as inputs.
  • Traffic volumes are taken from the Environmental Impact assessment of the Rauma Port Expansion[1], from which the amounts are converted to daily basis.
    • Half of the trains are assumed to be electric, half diesel.
Emissions to air in different port expansion options [1]. Note that these are not equal to the three city planning options. Rather, Ve2 is most closely related to city planning options 1 and 3, while Ve4 is related to city planning option 2.
Ship emissions on sea and at port (t/a)
Port expansion option CO NOx PM10 PM2.5 SO2 CO2
Current 14.8 200.7 3.1 2.5 28.9 10193.0
Ve0 17.4 235.6 3.7 2.9 33.9 11964.3
Ve1 (Saukot) 22.6 305.9 4.8 3.8 44.0 15538.1
Ve2 (Ruuhiluoto) 33.9 458.9 7.2 5.7 66.0 23307.2
Ve3 (Järviluoto) 33.9 458.9 7.2 5.7 66.0 23307.2
Ve4 (Hanskloppi) 31.6 428.3 6.7 5.4 61.6 21753.4
Heavy duty vehicles (t/a)
Port expansion option CO HC NOx PM SO2 CO2
Current 2.9 1.7 34.3 0.6 0.0 4868.7
Ve0 3.3 1.9 40.1 0.7 0.1 5680.1
Ve1 (Saukot) 4.9 2.8 58.3 1.0 0.1 8260.3
Ve2 (Ruuhiluoto) 7.1 4.1 85.6 1.4 0.1 12135.2
Ve3 (Järviluoto) 7.8 4.5 93.2 1.6 0.1 13215.6
Ve4 (Hanskloppi) 7.4 4.3 89.2 1.5 0.1 12645.8

City planning options

There are three main city planning options under evaluation. These are described here in brief, and some important aspects are shown on the map.

Option 1 (Centre and nearby areas)
Port is kept at its current place and expanded. The city will grow around the current centre and port to the nearby areas.
Option 2 (From centre to sea)
The port is moved south to a current industrial area. The city will grow toward the sea to the current port area. This has the most compact city structure.
Option 3 (Shores and paths)
Port is kept at its current place and expanded. The city will grow to south and north near the seashore. This will be the most dispersed city structure.


<googlemap version="0.9" lat="61.12318" lon="21.508827" type="map" width="700" height="500"> 61.12809, 21.436729 Current port 61.13588, 21.43158 Saukot (Port expansion option Ve1) 61.127095, 21.407547 Ruuhiluoto (Port expansion option Ve2) 61.121688, 21.444626 Järviluoto (Port expansion option Ve3) 61.112235, 21.437759 Hanskloppi (Port expansion option Ve4) 6#B2758BC5 61.130079, 21.436729 61.131634, 21.491318 Current road and railroad connection; assumed emission point 61.134949, 21.533203 61.145886, 21.560669 61.153838, 21.601868 6#B2758BC5 61.152513, 21.603241 61.121356, 21.606674 61.100457, 21.586761 61.088841, 21.540756 61.097802, 21.492691 Southern railroad, optional in city planning option 2; assumed emission point 61.107757, 21.469345 61.121292, 21.456985 6#B2758BC5 61.153838, 21.600494 61.149404, 21.568222 61.133496, 21.53801 61.120361, 21.520844 Road to the new southern port area; assumed emission point 61.110742, 21.509171 61.108752, 21.483078 61.118244, 21.462479 </googlemap>